How do you build a construction punch list?

What are typical punch list items?

- Appliances are working correctly & fully functional. - Cabinet doors and drawers are opening & closing smoothly and without any problems. - Doors open and close properly & sealed tightly. - Floors are damage free from construction. - Hardware (hinges, locks, latches) work fluently.

What is a punch list walk through?

A punch list is a list of tasks and items that need to be fixed or completed before a construction project can be considered finished. ... To ensure the best review process, the contractor, subcontractor, owner, and architect should all walk through the project together.28 dic 2018

What is a builder's punch list?

A punch list is part of the project closeout portion of the construction process in which a contractor prepares a document that lists any work that has not been completed, or not been completed correctly.11 mar 2020

What is builder punch?

In regards to construction today, the Business Dictionary defines a punch list as, “Listing of items requiring immediate attention” and as a “Document listing work that does not conform to contract specifications, usually attached to the certificate of substantial completion.7 nov 2020

What is a punch list job?

A punch list is a document prepared during key milestones or near the end of a construction project listing work not conforming to contract specifications that the general contractor must complete prior to final payment. ... This snag list, generated by the Contractor is known as the punch list.

What is considered punch list?

A punch list (also called a snag list, deficiency list, or punch out list), according to the online Business Dictionary, is “a document listing work that does not conform to contract specifications, usually attached to a certificate of substantial completion.” Put simply, it is a list of to-do's that need to be ...28 dic 2018

What is a punch list meeting?

Remember; a punch list meeting is where the client, architect, and general contractor inspect the project and document all the issues that need to be solved before the final payment will be released. During this meeting, many things need to be reviewed, and multiple people attend, and sharing their thoughts.24 oct 2019