How to install a starter strip for CertainTeed vinyl siding is covered in HomeTips.

There are affiliate links in this post.See our disclosures for more information.

This article is a continuation of the discussion that began with Step 1: How to install vinyl and aluminum siding.The techniques for preparing the wall precede the installation of all siding and trim.Others are not.Vertical siding uses a base trim along the bottom instead of a starter strip.Horizontal siding is the most common type used and we focus on its installation here.The instructions for installing vertical vinyl siding may need to be adjusted slightly.The new siding will begin here.The chalk line should be level and a consistent distance from the top and bottom of the windows.A wooden spacer can be used to provide the proper angle for the first strip.This should be nailed every 6 inches, with the lower edge running along the chalk line.To seal the edge of a siding panel where it has been cut, you can use under-sill trim.The ends of the starter strips should be at least 1/2 inch apart.There is a nail in the center of the slots.If using insulation or backerboard, make sure to fit the thickness.Corner posts are positioned at exterior and interior corners.After checking for plumb, nail them every 12 inches.If you need to stack posts end-to-end to reach the full height of the wall, cut a quarter inch from the bottom of each post and position them so that the lower post overlaps the top post.First, install the tops, sides, and the window surrounds.Installation of J channels at doors and windows, under roof eaves and rakes, and base trim with vertical siding is done along the tops.Cut tabs at the ends.Every 12 inches on the center, nail the trim.The top nail should be placed at the top of the nail slot and all other nails in the center.If the sides are also mitered, you should do the same.Under-sill trim and J-channel trim can be installed at the bottoms of windows.Installation of F-channel trim at the soffit and gable rake is required for horizontal siding.Installation of J-channel trim is required for vertical siding.On the center of the nail, nail every 12 inches.The next step is how to install horizontal vinyl siding panels.He worked as a home expert for several years.HomeTips was founded by Don in 1996.How to Protect your Home from Rainwater DamageSmart Devices Protect Your Home During Power Outages...

Installation of the starter strips and corner posts is ready to begin.The techniques for preparing the wall precede the installation of all siding and trim.Others are not.Vertical siding uses a base trim along the bottom instead of a starter strip.Horizontal siding is the most common type used and we focus on its installation here.The instructions for installing vertical vinyl siding may need to be adjusted slightly.The new siding will begin here.The chalk line should be level and a consistent distance from the top and bottom of the windows.A wooden spacer can be used to provide the proper angle for the first strip.This should be nailed every 6 inches, with the lower edge running along the chalk line.To seal the edge of a siding panel where it has been cut, you can use under-sill trim.The ends of the starter strips should be at least 1/2 inch apart.There is a nail in the center of the slots.If using insulation or backerboard, make sure to fit the thickness.Corner posts are positioned at exterior and interior corners.After checking for plumb, nail them every 12 inches.If you need to stack posts end-to-end to reach the full height of the wall, cut a quarter inch from the bottom of each post and position them so that the lower post overlaps the top post.First, install the tops, sides, and the window surrounds.Installation of J channels at doors and windows, under roof eaves and rakes, and base trim with vertical siding is done along the tops.Cut tabs at the ends.Every 12 inches on the center, nail the trim.The top nail should be placed at the top of the nail slot and all other nails in the center.If the sides are also mitered, you should do the same.Under-sill trim and J-channel trim can be installed at the bottoms of windows.Installation of F-channel trim at the soffit and gable rake is required for horizontal siding.Installation of J-channel trim is required for vertical siding.On the center of the nail, nail every 12 inches.The next step is how to install horizontal vinyl siding panels.He worked as a home expert for several years.HomeTips was founded by Don in 1996.How to Protect your Home from Rainwater DamageSmart Devices Protect Your Home During Power Outages...

The same mounting strips are used for both horizontal and vertical siding.Others are not.Vertical siding uses a base trim along the bottom instead of a starter strip.Horizontal siding is the most common type used and we focus on its installation here.The instructions for installing vertical vinyl siding may need to be adjusted slightly.The new siding will begin here.The chalk line should be level and a consistent distance from the top and bottom of the windows.A wooden spacer can be used to provide the proper angle for the first strip.This should be nailed every 6 inches, with the lower edge running along the chalk line.To seal the edge of a siding panel where it has been cut, you can use under-sill trim.The ends of the starter strips should be at least 1/2 inch apart.There is a nail in the center of the slots.If using insulation or backerboard, make sure to fit the thickness.Corner posts are positioned at exterior and interior corners.After checking for plumb, nail them every 12 inches.If you need to stack posts end-to-end to reach the full height of the wall, cut a quarter inch from the bottom of each post and position them so that the lower post overlaps the top post.First, install the tops, sides, and the window surrounds.Installation of J channels at doors and windows, under roof eaves and rakes, and base trim with vertical siding is done along the tops.Cut tabs at the ends.Every 12 inches on the center, nail the trim.The top nail should be placed at the top of the nail slot and all other nails in the center.If the sides are also mitered, you should do the same.Under-sill trim and J-channel trim can be installed at the bottoms of windows.Installation of F-channel trim at the soffit and gable rake is required for horizontal siding.Installation of J-channel trim is required for vertical siding.On the center of the nail, nail every 12 inches.The next step is how to install horizontal vinyl siding panels.He worked as a home expert for several years.HomeTips was founded by Don in 1996.How to Protect your Home from Rainwater DamageSmart Devices Protect Your Home During Power Outages...

After determining the lowest corner of the house, you can use a level chalk line to determine the base of a starter strip.The new siding will begin here.The chalk line should be level and a consistent distance from the top and bottom of the windows.A wooden spacer can be used to provide the proper angle for the first strip.This should be nailed every 6 inches, with the lower edge running along the chalk line.To seal the edge of a siding panel where it has been cut, you can use under-sill trim.The ends of the starter strips should be at least 1/2 inch apart.There is a nail in the center of the slots.If using insulation or backerboard, make sure to fit the thickness.Corner posts are positioned at exterior and interior corners.After checking for plumb, nail them every 12 inches.If you need to stack posts end-to-end to reach the full height of the wall, cut a quarter inch from the bottom of each post and position them so that the lower post overlaps the top post.First, install the tops, sides, and the window surrounds.Installation of J channels at doors and windows, under roof eaves and rakes, and base trim with vertical siding is done along the tops.Cut tabs at the ends.Every 12 inches on the center, nail the trim.The top nail should be placed at the top of the nail slot and all other nails in the center.If the sides are also mitered, you should do the same.Under-sill trim and J-channel trim can be installed at the bottoms of windows.Installation of F-channel trim at the soffit and gable rake is required for horizontal siding.Installation of J-channel trim is required for vertical siding.On the center of the nail, nail every 12 inches.The next step is how to install horizontal vinyl siding panels.He worked as a home expert for several years.HomeTips was founded by Don in 1996.How to Protect your Home from Rainwater DamageSmart Devices Protect Your Home During Power Outages...

After determining the lowest corner of the house, use a level chalk line to create the first starter strip.The new siding will begin here.The chalk line should be level and a consistent distance from the top and bottom of the windows.A wooden spacer can be used to provide the proper angle for the first strip.This should be nailed every 6 inches, with the lower edge running along the chalk line.To seal the edge of a siding panel where it has been cut, you can use under-sill trim.The ends of the starter strips should be at least 1/2 inch apart.There is a nail in the center of the slots.If using insulation or backerboard, make sure to fit the thickness.Corner posts are positioned at exterior and interior corners.After checking for plumb, nail them every 12 inches.If you need to stack posts end-to-end to reach the full height of the wall, cut a quarter inch from the bottom of each post and position them so that the lower post overlaps the top post.First, install the tops, sides, and the window surrounds.Installation of J channels at doors and windows, under roof eaves and rakes, and base trim with vertical siding is done along the tops.Cut tabs at the ends.Every 12 inches on the center, nail the trim.The top nail should be placed at the top of the nail slot and all other nails in the center.If the sides are also mitered, you should do the same.Under-sill trim and J-channel trim can be installed at the bottoms of windows.Installation of F-channel trim at the soffit and gable rake is required for horizontal siding.Installation of J-channel trim is required for vertical siding.On the center of the nail, nail every 12 inches.The next step is how to install horizontal vinyl siding panels.He worked as a home expert for several years.HomeTips was founded by Don in 1996.How to Protect your Home from Rainwater DamageSmart Devices Protect Your Home During Power Outages...

The bottom course of siding is secured with a starter strip that holds it at the proper angle.A wooden spacer can be used to provide the proper angle for the first strip.This should be nailed every 6 inches, with the lower edge running along the chalk line.To seal the edge of a siding panel where it has been cut, you can use under-sill trim.The ends of the starter strips should be at least 1/2 inch apart.There is a nail in the center of the slots.If using insulation or backerboard, make sure to fit the thickness.Corner posts are positioned at exterior and interior corners.After checking for plumb, nail them every 12 inches.If you need to stack posts end-to-end to reach the full height of the wall, cut a quarter inch from the bottom of each post and position them so that the lower post overlaps the top post.First, install the tops, sides, and the window surrounds.Installation of J channels at doors and windows, under roof eaves and rakes, and base trim with vertical siding is done along the tops.Cut tabs at the ends.Every 12 inches on the center, nail the trim.The top nail should be placed at the top of the nail slot and all other nails in the center.If the sides are also mitered, you should do the same.Under-sill trim and J-channel trim can be installed at the bottoms of windows.Installation of F-channel trim at the soffit and gable rake is required for horizontal siding.Installation of J-channel trim is required for vertical siding.On the center of the nail, nail every 12 inches.The next step is how to install horizontal vinyl siding panels.He worked as a home expert for several years.HomeTips was founded by Don in 1996.How to Protect your Home from Rainwater DamageSmart Devices Protect Your Home During Power Outages...

If the lower portion of a horizontal siding panel must be trimmed so that it can be installed over areas such as steps and porches, make sure the panel is furred out with a similar spacer for proper angle and rigidity.To seal the edge of a siding panel where it has been cut, you can use under-sill trim.The ends of the starter strips should be at least 1/2 inch apart.There is a nail in the center of the slots.If using insulation or backerboard, make sure to fit the thickness.Corner posts are positioned at exterior and interior corners.After checking for plumb, nail them every 12 inches.If you need to stack posts end-to-end to reach the full height of the wall, cut a quarter inch from the bottom of each post and position them so that the lower post overlaps the top post.First, install the tops, sides, and the window surrounds.Installation of J channels at doors and windows, under roof eaves and rakes, and base trim with vertical siding is done along the tops.Cut tabs at the ends.Every 12 inches on the center, nail the trim.The top nail should be placed at the top of the nail slot and all other nails in the center.If the sides are also mitered, you should do the same.Under-sill trim and J-channel trim can be installed at the bottoms of windows.Installation of F-channel trim at the soffit and gable rake is required for horizontal siding.Installation of J-channel trim is required for vertical siding.On the center of the nail, nail every 12 inches.The next step is how to install horizontal vinyl siding panels.He worked as a home expert for several years.HomeTips was founded by Don in 1996.How to Protect your Home from Rainwater DamageSmart Devices Protect Your Home During Power Outages...

Corner posts and J- channels can be expanded by installing the starter strips.The ends of the starter strips should be at least 1/2 inch apart.There is a nail in the center of the slots.If using insulation or backerboard, make sure to fit the thickness.Corner posts are positioned at exterior and interior corners.After checking for plumb, nail them every 12 inches.If you need to stack posts end-to-end to reach the full height of the wall, cut a quarter inch from the bottom of each post and position them so that the lower post overlaps the top post.First, install the tops, sides, and the window surrounds.Installation of J channels at doors and windows, under roof eaves and rakes, and base trim with vertical siding is done along the tops.Cut tabs at the ends.Every 12 inches on the center, nail the trim.The top nail should be placed at the top of the nail slot and all other nails in the center.If the sides are also mitered, you should do the same.Under-sill trim and J-channel trim can be installed at the bottoms of windows.Installation of F-channel trim at the soffit and gable rake is required for horizontal siding.Installation of J-channel trim is required for vertical siding.On the center of the nail, nail every 12 inches.The next step is how to install horizontal vinyl siding panels.He worked as a home expert for several years.HomeTips was founded by Don in 1996.How to Protect your Home from Rainwater DamageSmart Devices Protect Your Home During Power Outages...

Corner posts are positioned at exterior and interior corners.After checking for plumb, nail them every 12 inches.If you need to stack posts end-to-end to reach the full height of the wall, cut a quarter inch from the bottom of each post and position them so that the lower post overlaps the top post.First, install the tops, sides, and the window surrounds.Installation of J channels at doors and windows, under roof eaves and rakes, and base trim with vertical siding is done along the tops.Cut tabs at the ends.Every 12 inches on the center, nail the trim.The top nail should be placed at the top of the nail slot and all other nails in the center.If the sides are also mitered, you should do the same.Under-sill trim and J-channel trim can be installed at the bottoms of windows.Installation of F-channel trim at the soffit and gable rake is required for horizontal siding.Installation of J-channel trim is required for vertical siding.On the center of the nail, nail every 12 inches.The next step is how to install horizontal vinyl siding panels.He worked as a home expert for several years.HomeTips was founded by Don in 1996.How to Protect your Home from Rainwater DamageSmart Devices Protect Your Home During Power Outages...

Corner posts can be suspended by two nails driven into the uppermost slot.After checking for plumb, nail them every 12 inches.If you need to stack posts end-to-end to reach the full height of the wall, cut a quarter inch from the bottom of each post and position them so that the lower post overlaps the top post.First, install the tops, sides, and the window surrounds.Installation of J channels at doors and windows, under roof eaves and rakes, and base trim with vertical siding is done along the tops.Cut tabs at the ends.Every 12 inches on the center, nail the trim.The top nail should be placed at the top of the nail slot and all other nails in the center.If the sides are also mitered, you should do the same.Under-sill trim and J-channel trim can be installed at the bottoms of windows.Installation of F-channel trim at the soffit and gable rake is required for horizontal siding.Installation of J-channel trim is required for vertical siding.On the center of the nail, nail every 12 inches.The next step is how to install horizontal vinyl siding panels.He worked as a home expert for several years.HomeTips was founded by Don in 1996.How to Protect your Home from Rainwater DamageSmart Devices Protect Your Home During Power Outages...

caulk around the openings to create a seal.First, install the tops, sides, and the window surrounds.Installation of J channels at doors and windows, under roof eaves and rakes, and base trim with vertical siding is done along the tops.Cut tabs at the ends.Every 12 inches on the center, nail the trim.The top nail should be placed at the top of the nail slot and all other nails in the center.If the sides are also mitered, you should do the same.Under-sill trim and J-channel trim can be installed at the bottoms of windows.Installation of F-channel trim at the soffit and gable rake is required for horizontal siding.Installation of J-channel trim is required for vertical siding.On the center of the nail, nail every 12 inches.The next step is how to install horizontal vinyl siding panels.He worked as a home expert for several years.HomeTips was founded by Don in 1996.How to Protect your Home from Rainwater DamageSmart Devices Protect Your Home During Power Outages...

Cut the trim so it is longer than the opening.Cut tabs at the ends.Every 12 inches on the center, nail the trim.The top nail should be placed at the top of the nail slot and all other nails in the center.If the sides are also mitered, you should do the same.Under-sill trim and J-channel trim can be installed at the bottoms of windows.Installation of F-channel trim at the soffit and gable rake is required for horizontal siding.Installation of J-channel trim is required for vertical siding.On the center of the nail, nail every 12 inches.The next step is how to install horizontal vinyl siding panels.He worked as a home expert for several years.HomeTips was founded by Don in 1996.How to Protect your Home from Rainwater DamageSmart Devices Protect Your Home During Power Outages...

Installation of F-channel trim at the soffit and gable rake is required for horizontal siding.Installation of J-channel trim is required for vertical siding.On the center of the nail, nail every 12 inches.The next step is how to install horizontal vinyl siding panels.He worked as a home expert for several years.HomeTips was founded by Don in 1996.How to Protect your Home from Rainwater DamageSmart Devices Protect Your Home During Power Outages...

Installation of F-channel trim at the gable rake is required for horizontal siding.Installation of J-channel trim is required for vertical siding.On the center of the nail, nail every 12 inches.The next step is how to install horizontal vinyl siding panels.He worked as a home expert for several years.HomeTips was founded by Don in 1996.How to Protect your Home from Rainwater DamageSmart Devices Protect Your Home During Power Outages...

The next step is how to install horizontal vinyl siding panels.He worked as a home expert for several years.HomeTips was founded by Don in 1996.How to Protect your Home from Rainwater DamageSmart Devices Protect Your Home During Power Outages...

How to install horizontal vinyl siding panels.He worked as a home expert for several years.HomeTips was founded by Don in 1996.How to Protect your Home from Rainwater DamageSmart Devices Protect Your Home During Power Outages...

amzn_assoc_ad_mode is "auto"He worked as a home expert for several years.HomeTips was founded by Don in 1996.How to Protect your Home from Rainwater DamageSmart Devices Protect Your Home During Power Outages...

Don is the author or editor of every article at HomeTips.Don has over 30 years of experience as a remodeler and builder and has written more than 30 home improvement books.

Related Posts:

  1. There are photos of asphalt siding and concerns about it.
  2. How To Install Vinyl Siding
  3. Can I use a finish nailer for cedar siding?
  4. There is a guide to standard sofa sizes and dimensions.